PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at Stair -3 Facing South.jpg Connecting copper piping to the 2nd floor VAV Boxes Facing West.jpg Continued laying out block at bathrooms 133-136 Facing West.jpg Installing copper piping at the 3rd floor bathrooms Facing North.jpg Installing sprinkler branches at the 1st floor  Facing West.jpg Preping for the slab on grade Facing North.jpg Duct work up through the lower roof Facing South.jpg
Previous pageNext page Continued laying out block at bathrooms 133-136 Facing West
Continued laying out block at bathrooms 133-136 Facing West